OK
A P PLASTERING is a notable inspection in the OK category. This page provides verified data from US Department of Labor — OSHA Enforcement Data (v4 API) (2026), helping you compare A P PLASTERING against similar inspections and make data-driven decisions.
WALL-CON BUILDERS, INC.
OK
K & K CONSTRUCTION
OK
J & D HAULING INC.
OK
QUAPAW VALLEY BRIDGE COMPANY
OK
SUNNY & ASSOCIATES DBA JANI KING
OK
| activity nr | 308,061,357 |
| reporting id | 0627700 |
| estab name | A P PLASTERING |
| site address | 8222 E. 103RD STREET |
| site city | BIXBY |
| site state | OK |
| site zip | 74008 |
| owner type | A |
| owner type label | Private |
| sic code | 1742 |
| naics code | 238310 |
| insp type | C |
| insp type label | Referral |
| insp scope | A |
| insp scope label | Complete |
| safety hlth | H |
| safety hlth label | Health |
| union status | N |
| union status label | N/A |
| nr in estab | 8 |
| open date | 2005-01-27 |
| close conf date | 2005-01-27 |
| close case date | 2005-03-10 |
| load dt | 2011-10-14 |
This OSHA inspection of A P PLASTERING in OK opened on Jan 27, 2005 and closed after 1 months. The review was initiated via a referral and focused on occupational health exposures. Scope of the walk-around was complete. At the time of inspection, the establishment reported 8 employees on site.
The site of record for this inspection is listed below. Industry classification uses NAICS code 238310 (legacy SIC: 1742). Addresses reflect the establishment's location at the time of inspection.
The 10 inspections below share NAICS 2-digit sector 23 and occurred in OK. Grouping by sector and state provides a peer set for reading a p plastering in context — same regulatory climate, same broad industry mix. Rows are sorted by most recent open date.
| Establishment | City | Opened | Type | Focus |
|---|---|---|---|---|
| SUPREME SYSTEMS INC. | TULSA | Aug 12, 2016 | Referral | Safety |
| DAVIS H. ELLIOT COMPANY, INC. | OILTON | Feb 5, 2013 | Referral | Safety |
| FLINTCO, LLC | CATOOSA | Feb 29, 2012 | Planned | Safety |
| SHILOH ENTERPRISES, INC | EDMOND | Feb 23, 2012 | Planned | Safety |
| FLINTCO, LLC | NORMAN | Jan 19, 2012 | Planned | Safety |
| BENCHMARK QUALITY BUILDERS | CLAREMORE | Jan 12, 2012 | Planned | Safety |
| SARATOGA ROOFING & CONSTRUCTION | ALTUS AFB | Jan 4, 2012 | Planned | Safety |
| NABHOLZ CONSTRUCTION | BROKEN ARROW | Dec 8, 2011 | Planned | Safety |
| SOUTHWIND CONSTRUCTION INC. | VANCE AFB, OK | Nov 21, 2011 | Planned | Safety |
| REYMUNDO VILLEGAS | NORMAN | Oct 4, 2011 | Planned | Safety |
In total, 1,295 OSHA inspections in OK appear in this dataset. During 2005 alone, 32 inspections were recorded in the state — this inspection at A P PLASTERING is one of them. Enforcement volume varies year-over-year with OSHA staffing, federal priorities, and complaint inflow, so cross-year comparisons are most useful as a rough indicator of activity rather than a strict measure of risk.
This data helps you understand how A P PLASTERING compares to others in the OK category. Use it to make informed decisions based on verified data from US Department of Labor — OSHA Enforcement Data (v4 API).
inspections with the closest data values to A P PLASTERING
The OSHAPeek editorial team aggregates and verifies inspections data from US Department of Labor — OSHA Enforcement Data (v4 API). Every statistic on this site is cross-referenced against the official source before publication, with quarterly re-verification cycles.
Read our full methodology or contact us with corrections.
Explore More Data Tools
For adjacent public-data tools, methodology notes, and network updates, visit DataPeek Facts.