MA
BRIDGE SUPERSTRUCTURE REPLACEMENT is a notable inspection in the MA category. This page provides verified data from US Department of Labor — OSHA Enforcement Data (v4 API) (2026), helping you compare BRIDGE SUPERSTRUCTURE REPLACEMENT against similar inspections and make data-driven decisions.
| activity nr | 313,204,950 |
| reporting id | 0112600 |
| estab name | BRIDGE SUPERSTRUCTURE REPLACEMENT |
| site address | RED BRIDGE RD. |
| site city | WILBRAHAM |
| site state | MA |
| site zip | 01095 |
| owner type | B |
| owner type label | State Government |
| sic code | 1622 |
| naics code | 237310 |
| insp type | H |
| insp type label | Planned |
| insp scope | D |
| insp scope label | Records |
| safety hlth | S |
| safety hlth label | Safety |
| union status | N/A |
| union status label | N/A |
| nr in estab | N/A |
| open date | 2010-06-09 |
| close conf date | N/A |
| close case date | 2010-06-09 |
| load dt | 2011-10-14 |
This OSHA inspection of BRIDGE SUPERSTRUCTURE REPLACEMENT in MA opened on Jun 9, 2010 and closed the same day. The review was conducted as a programmed/planned review and focused on workplace safety conditions. Scope of the walk-around was records.
The site of record for this inspection is listed below. Industry classification uses NAICS code 237310 (legacy SIC: 1622). Addresses reflect the establishment's location at the time of inspection.
The 10 inspections below share NAICS 2-digit sector 23 and occurred in MA. Grouping by sector and state provides a peer set for reading bridge superstructure replacement in context — same regulatory climate, same broad industry mix. Rows are sorted by most recent open date.
| Establishment | City | Opened | Type | Focus |
|---|---|---|---|---|
| M. O'CONNOR CONTRACTING, INCORPORATED | ATTLEBORO | Jun 7, 2012 | Follow-up | Health |
| PALACE CONSTRUCTION,INC | NORTHBOROUGH | Mar 19, 2012 | Programmed Related | Safety |
| PULTE HOME CORPORATION OF NEW ENGLAND | BRAINTREE | Mar 2, 2012 | Planned | Safety |
| ADVANCED CONSTRUCTION TECHNOLOGIES CORPORATION | FALL RIVER | Feb 6, 2012 | Referral | Health |
| PHOENIX SHEET METAL, INCORPORATED | ROCKLAND | Jan 19, 2012 | Planned | Safety |
| TURNPIKE GENERAL CONTRACTING DBA OLYMPIC ROOFING,I | DORCHESTER | Dec 6, 2011 | Complaint | Safety |
| CAPEWAY ROOFING SYSTEMS INC. | OAKHAM | Dec 6, 2011 | Follow-up | Health |
| JEREMY PARTRIDGE | LEICESTER | Nov 30, 2011 | Referral | Safety |
| RILEY BROTHERS, INC | METHUEN | Nov 18, 2011 | Referral | Safety |
| M. O'CONNOR CONTRACTING, INCORPORATED | ATTLEBORO | Nov 17, 2011 | Referral | Safety |
In total, 2,482 OSHA inspections in MA appear in this dataset. During 2010 alone, 61 inspections were recorded in the state — this inspection at BRIDGE SUPERSTRUCTURE REPLACEMENT is one of them. Enforcement volume varies year-over-year with OSHA staffing, federal priorities, and complaint inflow, so cross-year comparisons are most useful as a rough indicator of activity rather than a strict measure of risk.
This data helps you understand how BRIDGE SUPERSTRUCTURE REPLACEMENT compares to others in the MA category. Use it to make informed decisions based on verified data from US Department of Labor — OSHA Enforcement Data (v4 API).
inspections with the closest data values to BRIDGE SUPERSTRUCTURE REPLACEMENT
The OSHAPeek editorial team aggregates and verifies inspections data from US Department of Labor — OSHA Enforcement Data (v4 API). Every statistic on this site is cross-referenced against the official source before publication, with quarterly re-verification cycles.
Read our full methodology or contact us with corrections.
Explore More Data Tools
For adjacent public-data tools, methodology notes, and network updates, visit DataPeek Facts.