ME
FAIRCHILD SEMICONDUCTOR is a notable inspection in the ME category. This page provides verified data from US Department of Labor — OSHA Enforcement Data (v4 API) (2026), helping you compare FAIRCHILD SEMICONDUCTOR against similar inspections and make data-driven decisions.
| activity nr | 301,670,287 |
| reporting id | 0111100 |
| estab name | FAIRCHILD SEMICONDUCTOR |
| site address | 333 WESTERN AVE. |
| site city | SOUTH PORTLAND |
| site state | ME |
| site zip | 04106 |
| owner type | A |
| owner type label | Private |
| sic code | 3674 |
| naics code | 334413 |
| insp type | G |
| insp type label | Unprogrammed Related |
| insp scope | B |
| insp scope label | Partial |
| safety hlth | H |
| safety hlth label | Health |
| union status | N |
| union status label | N/A |
| nr in estab | 800 |
| open date | 2002-09-30 |
| close conf date | 2003-04-03 |
| close case date | 2003-11-10 |
| load dt | 2011-10-14 |
This OSHA inspection of FAIRCHILD SEMICONDUCTOR in ME opened on Sep 30, 2002 and closed after 1.1 years. The review was recorded in the DOL enforcement dataset and focused on occupational health exposures. Scope of the walk-around was partial. At the time of inspection, the establishment reported 800 employees on site.
The site of record for this inspection is listed below. Industry classification uses NAICS code 334413 (legacy SIC: 3674). Addresses reflect the establishment's location at the time of inspection.
The 9 inspections below share NAICS 2-digit sector 33 and occurred in ME. Grouping by sector and state provides a peer set for reading fairchild semiconductor in context — same regulatory climate, same broad industry mix. Rows are sorted by most recent open date.
| Establishment | City | Opened | Type | Focus |
|---|---|---|---|---|
| SEA ROSE TRAP CO. | SCARBOROUGH | Feb 2, 2012 | Complaint | Safety |
| J.S. BOATWORKS INC. | BRUNSWICK | Nov 29, 2011 | Planned | Health |
| CENTRAL CITY SHEET METAL | GORHAM | Aug 26, 2010 | Follow-up | Health |
| MID STATE MACHINE PRODUCTS | WINSLOW | Aug 12, 2010 | Planned | Safety |
| W.A. MACHINE COMPANY | POWNAL | May 11, 2009 | Planned | Safety |
| MCCANN FABRICATION | NEW GLOUCESTER | Mar 19, 2009 | Planned | Safety |
| TURNER MACHINE & SPRING CO. INC. | TURNER | Feb 17, 2009 | Planned | Safety |
| PRECISION WELDING & FABRICATION | WESTBROOK | Feb 11, 2009 | Planned | Safety |
| LEIGHTON'S WELDING | STONINGTON | Apr 16, 2008 | Planned | Safety |
In total, 694 OSHA inspections in ME appear in this dataset. During 2002 alone, 25 inspections were recorded in the state — this inspection at FAIRCHILD SEMICONDUCTOR is one of them. Enforcement volume varies year-over-year with OSHA staffing, federal priorities, and complaint inflow, so cross-year comparisons are most useful as a rough indicator of activity rather than a strict measure of risk.
This data helps you understand how FAIRCHILD SEMICONDUCTOR compares to others in the ME category. Use it to make informed decisions based on verified data from US Department of Labor — OSHA Enforcement Data (v4 API).
inspections with the closest data values to FAIRCHILD SEMICONDUCTOR
The OSHAPeek editorial team aggregates and verifies inspections data from US Department of Labor — OSHA Enforcement Data (v4 API). Every statistic on this site is cross-referenced against the official source before publication, with quarterly re-verification cycles.
Read our full methodology or contact us with corrections.
Explore More Data Tools
For adjacent public-data tools, methodology notes, and network updates, visit DataPeek Facts.