WA
METRO POWER DIST HEADQUARTERS is a notable inspection in the WA category. This page provides verified data from US Department of Labor — OSHA Enforcement Data (v4 API) (2026), helping you compare METRO POWER DIST HEADQUARTERS against similar inspections and make data-driven decisions.
| activity nr | 308,740,471 |
| reporting id | 1055320 |
| estab name | METRO POWER DIST HEADQUARTERS |
| site address | VIRGINIA & 3RD AVE |
| site city | SEATTLE |
| site state | WA |
| site zip | 98134 |
| owner type | B |
| owner type label | State Government |
| sic code | 9111 |
| naics code | 921110 |
| insp type | H |
| insp type label | Planned |
| insp scope | A |
| insp scope label | Complete |
| safety hlth | S |
| safety hlth label | Safety |
| union status | N |
| union status label | N/A |
| nr in estab | 6 |
| open date | 2005-05-02 |
| close conf date | 2005-05-02 |
| close case date | 2005-05-02 |
| load dt | 2011-10-14 |
This OSHA inspection of METRO POWER DIST HEADQUARTERS in WA opened on May 2, 2005 and closed the same day. The review was conducted as a programmed/planned review and focused on workplace safety conditions. Scope of the walk-around was complete. At the time of inspection, the establishment reported 6 employees on site.
The site of record for this inspection is listed below. Industry classification uses NAICS code 921110 (legacy SIC: 9111). Addresses reflect the establishment's location at the time of inspection.
The 10 inspections below share NAICS 2-digit sector 92 and occurred in WA. Grouping by sector and state provides a peer set for reading metro power dist headquarters in context — same regulatory climate, same broad industry mix. Rows are sorted by most recent open date.
| Establishment | City | Opened | Type | Focus |
|---|---|---|---|---|
| SEATTLE FIRE DEPARTMENT | SEATTLE | Dec 22, 2014 | Unprogrammed Related | Health |
| TOWN OF FRIDAY HARBOR | FRIDAY HARBOR | Jun 24, 2014 | Planned | Safety |
| CENTRALIA PARKS & RECREATION | CENTRALIA | Jan 29, 2014 | Planned | Safety |
| CITY OF SEATTLE | SHORELINE | Dec 17, 2013 | Planned | Safety |
| SPOKANE FIRE DEPT | SPOKANE | Sep 13, 2013 | Follow-up | Safety |
| SOUTHWEST REGION | CHEHALIS | Jun 13, 2013 | Planned | Safety |
| CITY OF TACOMA | FIFE | Apr 23, 2013 | Programmed Related | Safety |
| DNR OLYMPIA DIVISION | OLYMPIA | Apr 22, 2013 | Follow-up | Safety |
| DNR OLYMPIA DIVISION | OLYMPIA | Oct 11, 2012 | Referral | Safety |
| LEWIS COUNTY FIRE DISTRICT # 5 | NAPAVINE | Jun 14, 2012 | Planned | Safety |
In total, 5,448 OSHA inspections in WA appear in this dataset. During 2005 alone, 240 inspections were recorded in the state — this inspection at METRO POWER DIST HEADQUARTERS is one of them. Enforcement volume varies year-over-year with OSHA staffing, federal priorities, and complaint inflow, so cross-year comparisons are most useful as a rough indicator of activity rather than a strict measure of risk.
This data helps you understand how METRO POWER DIST HEADQUARTERS compares to others in the WA category. Use it to make informed decisions based on verified data from US Department of Labor — OSHA Enforcement Data (v4 API).
inspections with the closest data values to METRO POWER DIST HEADQUARTERS
The OSHAPeek editorial team aggregates and verifies inspections data from US Department of Labor — OSHA Enforcement Data (v4 API). Every statistic on this site is cross-referenced against the official source before publication, with quarterly re-verification cycles.
Read our full methodology or contact us with corrections.
Explore More Data Tools
For adjacent public-data tools, methodology notes, and network updates, visit DataPeek Facts.