TX
OPTIMIZED PROCESS DESIGN INC. is a notable inspection in the TX category. This page provides verified data from US Department of Labor — OSHA Enforcement Data (v4 API) (2026), helping you compare OPTIMIZED PROCESS DESIGN INC. against similar inspections and make data-driven decisions.
MTPCS HOLDINGS, LLC DBA CELLULAR ONE
TX
DAVID LOZANO
DC
TRU-COUNT, INC.
IA
D. B. LEE DEVELOPMENT, INC.
DC
CARDINAL CONSTRUCTION, INC.
IA
| activity nr | 316,301,860 |
| reporting id | 0626000 |
| estab name | OPTIMIZED PROCESS DESIGN INC. |
| site address | 3781 U.S. HWY 77A NORTH |
| site city | YOAKUM |
| site state | TX |
| site zip | 77995 |
| owner type | A |
| owner type label | Private |
| sic code | 1629 |
| naics code | 236210 |
| insp type | B |
| insp type label | Complaint |
| insp scope | B |
| insp scope label | Partial |
| safety hlth | S |
| safety hlth label | Safety |
| union status | N |
| union status label | N/A |
| nr in estab | 353 |
| open date | 2012-03-15 |
| close conf date | 2012-03-15 |
| close case date | 2013-03-08 |
| load dt | 2016-06-30 |
This OSHA inspection of OPTIMIZED PROCESS DESIGN INC. in TX opened on Mar 15, 2012 and closed after 12 months. The review was triggered by a complaint and focused on workplace safety conditions. Scope of the walk-around was partial. At the time of inspection, the establishment reported 353 employees on site.
The site of record for this inspection is listed below. Industry classification uses NAICS code 236210 (legacy SIC: 1629). Addresses reflect the establishment's location at the time of inspection.
The 10 inspections below share NAICS 2-digit sector 23 and occurred in TX. Grouping by sector and state provides a peer set for reading optimized process design inc. in context — same regulatory climate, same broad industry mix. Rows are sorted by most recent open date.
| Establishment | City | Opened | Type | Focus |
|---|---|---|---|---|
| NICANOR UGALDE VACA | AMARILLO | Oct 19, 2016 | Planned | Safety |
| LEE LEWIS CONSTRUCTION, INC. | LUBBOCK | Jun 15, 2016 | Programmed Related | Safety |
| TECHLINE CONSTRUCTION LLC | VAN ALSTYNE | Mar 26, 2013 | Planned | Safety |
| SYNDICATE CONSTRUCTION SERVICES, LLC | HOUSTON | Aug 31, 2012 | Planned | Health |
| DEMCON DEMOLITION | EL PASO | Apr 30, 2012 | Programmed Related | Health |
| ROSSMBERG RUIZ | GARLAND | Apr 5, 2012 | Planned | Safety |
| GERALDO | HASLET | Mar 29, 2012 | Planned | Safety |
| JOSE MARTINEZ | HASLET | Mar 29, 2012 | Planned | Safety |
| DAVIS BROTHERS CONSTRUCTION | ARLINGTON | Feb 29, 2012 | Planned | Safety |
| TOM OAKS CONSTRUCTION | ALICE | Feb 10, 2012 | Planned | Safety |
In total, 6,294 OSHA inspections in TX appear in this dataset. During 2012 alone, 25 inspections were recorded in the state — this inspection at OPTIMIZED PROCESS DESIGN INC. is one of them. Enforcement volume varies year-over-year with OSHA staffing, federal priorities, and complaint inflow, so cross-year comparisons are most useful as a rough indicator of activity rather than a strict measure of risk.
This data helps you understand how OPTIMIZED PROCESS DESIGN INC. compares to others in the TX category. Use it to make informed decisions based on verified data from US Department of Labor — OSHA Enforcement Data (v4 API).
inspections with the closest data values to OPTIMIZED PROCESS DESIGN INC.
The OSHAPeek editorial team aggregates and verifies inspections data from US Department of Labor — OSHA Enforcement Data (v4 API). Every statistic on this site is cross-referenced against the official source before publication, with quarterly re-verification cycles.
Read our full methodology or contact us with corrections.
Explore More Data Tools
For adjacent public-data tools, methodology notes, and network updates, visit DataPeek Facts.