MI
REILLY PLATING CO is a notable inspection in the MI category. This page provides verified data from US Department of Labor — OSHA Enforcement Data (v4 API) (2026), helping you compare REILLY PLATING CO against similar inspections and make data-driven decisions.
| activity nr | 312,064,843 |
| reporting id | 0552652 |
| estab name | REILLY PLATING CO |
| site address | 17760 CLARANN |
| site city | MELVINDALE |
| site state | MI |
| site zip | 48122 |
| owner type | A |
| owner type label | Private |
| sic code | 3471 |
| naics code | 332813 |
| insp type | F |
| insp type label | Follow-up |
| insp scope | D |
| insp scope label | Records |
| safety hlth | S |
| safety hlth label | Safety |
| union status | Y |
| union status label | N/A |
| nr in estab | N/A |
| open date | 2009-11-23 |
| close conf date | 2009-11-23 |
| close case date | 2009-12-03 |
| load dt | 2011-10-14 |
This OSHA inspection of REILLY PLATING CO in MI opened on Nov 23, 2009 and closed 10 days later. The review was recorded in the DOL enforcement dataset and focused on workplace safety conditions. Scope of the walk-around was records.
The site of record for this inspection is listed below. Industry classification uses NAICS code 332813 (legacy SIC: 3471). Addresses reflect the establishment's location at the time of inspection.
The 10 inspections below share NAICS 2-digit sector 33 and occurred in MI. Grouping by sector and state provides a peer set for reading reilly plating co in context — same regulatory climate, same broad industry mix. Rows are sorted by most recent open date.
| Establishment | City | Opened | Type | Focus |
|---|---|---|---|---|
| G M BRASS & ALUMINUM FOUNDRY CORP | BENTON HARBOR | Dec 23, 2015 | Follow-up | Health |
| BLUEBIRD ENTERPRISES | BROWN CITY | Oct 8, 2014 | Monitoring | Health |
| LAPEER PLATING AND PLASTICS | LAPEER | Sep 4, 2014 | Follow-up | Health |
| TWB CO LLC | MONROE | Jul 23, 2014 | Referral | Safety |
| US STEEL GREAT LAKES WORKS | ECORSE | Jul 17, 2014 | Planned | Safety |
| CONSTRUCTIVE SHEET METAL INC | GRAND RAPIDS | Jun 23, 2014 | Planned | Safety |
| METALON INDUSTRIES INC | CROSWELL | May 6, 2014 | Planned | Safety |
| CASEMER TOOL & MACHINE INC | OXFORD | Apr 1, 2014 | Planned | Safety |
| PAL-TEC INC | WALLACE | Mar 20, 2014 | Planned | Health |
| J N B MACHINING CO INC | FOWLERVILLE | Feb 24, 2014 | Complaint | Health |
In total, 6,000 OSHA inspections in MI appear in this dataset. During 2009 alone, 140 inspections were recorded in the state — this inspection at REILLY PLATING CO is one of them. Enforcement volume varies year-over-year with OSHA staffing, federal priorities, and complaint inflow, so cross-year comparisons are most useful as a rough indicator of activity rather than a strict measure of risk.
This data helps you understand how REILLY PLATING CO compares to others in the MI category. Use it to make informed decisions based on verified data from US Department of Labor — OSHA Enforcement Data (v4 API).
inspections with the closest data values to REILLY PLATING CO
The OSHAPeek editorial team aggregates and verifies inspections data from US Department of Labor — OSHA Enforcement Data (v4 API). Every statistic on this site is cross-referenced against the official source before publication, with quarterly re-verification cycles.
Read our full methodology or contact us with corrections.
Explore More Data Tools
For adjacent public-data tools, methodology notes, and network updates, visit DataPeek Facts.